Detailed information to the manhole cover frame repair

That's how it's done:

Einbringen der Schachtabsperrplatte in den defekten Schacht.

1.  Positioning of the rubble plate into the defective      manhole.


Positionieren des Schachtrahmenhebers und Anheben des Schachtrahmens.

2.  Positioning of the manhole frame lifter and raising of the      manhole frame.


Positionieren des Schachtrahmenhebers und Anheben des Schachtrahmens.

3.  Positioning of the manhole frame lifter and raising of the      manhole frame.


Bring in the shutter and mixing the fast-tying and shrink-free special pit sealing mortar EBRALIT®.

4.  Bring in the shutter and mixing the fast-tying and shrink-free      special pit sealing mortar EBRALIT ®.


Eingießen des hochfließfähigen Spezial-Schachtvergußmörtels EBRALIT® in die Schachtschalung.

5.  Eingießen des hochfließfähigen Spezial-     Schachtvergußmörtels EBRALIT® in die Schachtschalung.


The fast tied special pit sealing mortar EBRALIT® can be already stripped off after approximately 5 minutes.

6.  The fast tied special pit sealing mortar EBRALIT® can be      already stripped off after 5 minutes.


After completion of the new, high-duty fundament the rubble plate with it's entire resulted building debris is taken out.

7.  After completion of the new, high-duty fundament the rubble      plate with it's entire resulted debris is taken out.


 

Alternatively (against surcharge):
8.1. and 8.3. - Cutting around the manhole and installation of bituminous special compound.



Adjustment and/or sealing of the manhole frame to the road with hot bitumen as well as stone chipping for the optical adjustment to the lane.

8.1  Adjustment and/or sealing of the manhole frame to the        road with hot bitumen as well as stone chipping for the        optical adjustment to the lane.


Cutting:With the BECK special cutter you can cut circular around the manhole up to a depth by approx. 4 cm and width by 12, 24 or 36 cm.

8.2 Cutting:
      With the BECK special cutter you can cut circular around       the manhole up to a depth by approx. 4 cm and width by       12, 24 or 36 cm.


Installation of special fast-hardening bitumen.

8.3  Installation of special fast-hardening bitumen.

To top

Informations

Schachtregulierungen
Download (PDF)

Schachtneueinbauten
Download (PDF)

Schachtneueinbau
ACO Bituplan®
Download (PDF)

Schachtneueinbau
VIATOP-Niveau
Download (PDF)

Aus- und Neueinbau Straßenabläufe (Gully)
Download (PDF)

Umbauverfahren
Strassenkappen
Download (PDF)


Online Catalog
zum Online Produktkatalog

Hier können Sie unseren Online Produktkatalog ansehen ...

Locations

Beck GmbH
Obere Mühle 11
D-74906 Bad Rappenau-Bonfeld

Telefon: (+49) (0) 7066 / 9920 - 0
Telefax: (+49) (0) 7066 / 9920 - 20
E-Mail: info@beck-kanal.de




Beck GmbH
Dorfstrasse 70
D-17209 Priborn

Telefon: (+49) (0) 39923 / 71144
Telefax: (+49) (0) 39923 / 71145
E-Mail: priborn@beck-kanal.de




Beck Italien OHG
Pustertaler Straße 1
I-39030 Kiens (BZ)

Telefon: (+39) (0) 4 74 / 56 40 30
Telefax: (+39) (0) 4 74 / 56 14 00
E-Mail: info@beck-kanal.it


Supported by: adcone GmbH - EDV Systeme und Netzwerke & SPIDERSOFT GmbH - Unternehmensberatung und Softwareentwicklung